Production Terms

Lead Time and MOQ

Ready-to-ship items can usually move in 7 to 15 business days when stock and packaging are already confirmed.

Custom OEM/ODM private label projects usually require 60 to 90 days after physical or 3D color sample confirmation and deposit.

Reference MOQ: hard lures 300 packs per color with a 3,000 pack minimum total. Soft baits 500 packs per color with a 3,000 pack minimum total.

Buyer Notes

Lead time starts after sample confirmation, BOM lock, and deposit.
Projects under USD 20,000 total order value may incur a USD 350 logistics overhead surcharge.
MOQ can vary by material, finish, package type, and compliance requirement.

Bulk RFQ

Send Files and Specs

RICHIN responds with DFM feedback, MOQ guidance, tooling route, lead time, and B2B quote direction.